Installation steps and cooling effect of radiator

作者:Tianli biology點擊:439
When determining the layout of the radiator, the convection of the indoor hot and cold air should be considered, and the radiator should be close to the entrance of the cold air as far as possible to improve the uniformity of the room temperature distribution. If a room needs more radiators, it is better to install them in groups. If too many column radiators are combined together, their heat dissipation effect will be affected. If the number of assembled chips is compared with this standard group, when each group is less than 6 chips, the heat dissipation of each chip will increase by 5%, while when each group is 11-20 chips, the heat dissipation of each chip will decrease by 5%.
The tandem radiator is easy to be installed separately, and when it is overlapped up and down, the heat dissipation is also reduced. The inlet and outlet pipes should not be set on the same side of the radiator. When installing, the inlet pipe should be slightly raised to facilitate the exhaust.
Installation procedure of radiator
1. Slot the floor or wall. In order to bury the exposed pipeline, the construction team must make a groove on the wall and ground. The depth or width of the groove needs special installation personnel to collect the actual treatment.
2. Lay pipeline and protect card slot. According to the location of the radiator in the early stage, the branch pipe can be slotted and laid. According to the customer's demand, the steel groove can be laid in the branch pipe to protect the pipeline, and the system can be closed and water injected to pressurize.
3. Install the water distributor. The diversity water collector is a water flow distribution and collection device which is composed of a water distributor and a water collector. The water separator should be installed horizontally and cleaned after installation.
4. Pressure test the radiator system. This is a very important step in the radiator installation steps. The specific operation is as follows: close the main pipe connection valve, open the radiator inlet valve, and use the pressure test equipment to test. The test pressure should be 1.5 times of the normal use pressure, and not less than the test pressure of the whole community pipe network. It is qualified if there is no leakage for 3-5 minutes.
5. According to the decoration schedule. Radiator construction and hydropower construction are carried out simultaneously, so as not to affect the construction progress.
6. Install the radiator. Place the radiator stably, connect the valve connector with the inlet and outlet valves, use a level ruler to measure whether the radiator is straight and whether the pipeline installation meets the requirements, and then use a pipe clamp to tighten the connector.
7. The customer checks and accepts the whole radiator system. Usually, when replacing the construction, the workers will reserve the valve on the pipeline. After the installation, the stamping test should be carried out to prove that there is no running, dripping, leaking place before the acceptance can be completed.
8. The radiator system is installed. The whole radiator installation steps are completed, users can smoothly enter the use stage.

主站蜘蛛池模板: 亚洲国产精品久久久久秋霞小| 无码免费的毛片基地| 无码人妻丰满熟妇啪啪网站| 冲田杏梨av一区二区三区| 亚洲中文字幕aⅴ天堂自拍| 中文字幕人妻一区二区| 亚洲国产99精品国自产拍| 国产高清在线精品二区| 亚洲精品国偷自产在线99正片| 99久久久无码国产精品免费砚床| 久久久99精品成人片| 中文字幕精品一二三四五六七八| 成人无遮挡18禁免费视频| 亚洲欧美日韩综合一区在线观看| 玩弄人妻少妇精品视频| 果冻传媒mv免费播放在线观看| 精品国偷自产在线视频99| 亚洲国产成人片在线观看无码| 久久久久成人片免费观看| 久久aaaa片一区二区| 人人爽人人澡人人高潮| 永久亚洲成a人片777777| 国产v综合v亚洲欧美久久| 国产成人无码a区视频| 亚洲成av人片在线观看| 国产啪亚洲国产精品无码| 国产乱码人妻一区二区三区| 久久精品国产精品亚洲38| 毛片内射久久久一区| 华人少妇被黑人粗大的猛烈进| 亚洲女教师丝祙在线播放| 精品国产a∨无码一区二区三区| 国产aⅴ精品一区二区三区久久 | 久久精品国产亚洲欧美| 国内精品久久人妻无码妲己| 色偷偷色噜噜狠狠网站30根| 偷窥xxxx盗摄国产| 久久精品国产一区二区电影孕妇| 久久免精品一区二区| 国产人妻aⅴ一区二区三区色| 日本不卡一区二区中文字幕|